top of page

Finalised the works of Soldeu and Pas de la Casa. They have built two new roundabouts, should mean a

After months of work, two new roundabouts in Soldeu and Pas de la Casa, and the widenings of which are associated CG2, are now a reality. In the case of Pas de la Casa, the works have been done in the area of ​​the Petrol Station Gasopas while in Soldeu has been in the north exit, as the government has announced in a statement.


This work highlights the Government's statement, "represents an improvement for the better ordering and directing traffic in the area of ​​the crossing." This action adds, "gains importance in adverse conditions such as winter, or in situations of fog lights, thus reinforcing to the driver on the way to a zone of intersection ".


In addition, have improved road drainage and other services, while there have been improvements in the CG2 slopes in areas near the roundabout and railings have been placed for the new Pedestrian protection against drops and for vehicles. The railings are made of steel and wood, following the new trend in landscaping Government roads, especially in mountain areas.


Work began on 16 May 2014 and had a total cost of 905 720 euros.



Featured Posts
Recent Posts
Follow Us
Search By Tags
Archive
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page